Price Comparison

Price comparison against other makers

For the same 11 m trailer home, we compare what is actually included.

Item
Maker A (anonymous)
Mainland spec
Park Homes Okinawa
Incl. tax, Okinawa spec
Chassis
H-beam steel
Rust protection: hot-dip galvanizing ※3 Fully immersed at a dedicated plant after the frame is completed
▶ Watch the Video
Frame
Timber frame
Light-gauge steel frame
Designed for a 20-year real service life Not stated
Roof
Galvalume steel sheet
Galvalume steel sheet (Okinawa coastal spec)
Exterior walls
Metal siding
Fiber-cement siding (ventilated construction)
Window sashes & fittings
Okinawa spec (high wind-pressure sashes) S-4 or higher / W-5
Insulation & airtightness
Glass wool 16K
Glass wool 32K
Interior
Interior finishing work Timber substrate (insect- and rot-proofed)
Electrical (outlets and lighting)
Water supply and drainage piping
Prefabricated bathroom unit
Kitchen
Vanity unit
Washing machine pan
Toilet
Manufactured locally in Okinawa After-sales support
Price (unit price for reference, excl. transport/temporary works)
Unit price *Excluding transport and temporary works
Mainland spec
From ¥11,000,000
Incl. tax, Okinawa spec
¥14,750,000
Transport and installation cost Varies with site and terrain; approximate ¥2,200,000 ¥550,000
Typhoon protection work Approximate ¥220,000
Temporary works & site costs Varies with site conditions

*1 The Park Homes Okinawa figure is the unit price (incl. tax), excluding transport and installation (¥400,000) and temporary works (¥220,000).
*2 △: cost varies with the site, terrain and access route, so this is quoted separately.
*3 After the frame is fully assembled, machined and drilled, it is taken apart again and hot-dip galvanized at a dedicated plant. This removes 99.99% of what causes rust (we prioritize quality even though it means doing the work twice).
*The Maker A figure is the skeleton unit price (incl. tax) published on their official site. Plumbing, interior and Okinawa-spec options must be added separately.
*Typhoon protection work and gas work are quoted separately by both companies.